Some Push for Backup as Lunar Rover Selection Nears

One of 3 LTVs to be selected this month; allocating a second bidder funding through critical design review would provide insurance; 2 awards for spacesuits now has Axiom after Collins drop-out, 2 awards for commercial crew launches saw SpaceX leap ahead of Boeing; Initial awards of ~US$30M each in April 2024 allowed Intuitive Machines (IM), Lunar Outpost (LO), Astrolab to develop prototypes; for $4.6B full contract, selected vehicle must arrive on Moon by 2029 for Artemis services to 2039; IM and LO plan for Falcon 9 rocket and Nova-C lander, Astrolab plans Starship for launch/landing; Senate Commerce Committee votes on Isaacman nomination 8 December; full-Senate vote would follow, end-of-year adjournment scheduled 19 December
Image Credits: NASA, (l-r) Lunar Outpost, Astrolab, Intuitive Machines