Friday / 7 Oct 2022

CNSA Offering Payload Rideshares on Chang’E-7 MSP Lander Launching NET 2026

International science experiments / technology demonstrations encouraged to apply for space on Chang’E-7 Moon mission to a crater rim within South Pole-Aitken basin less than 5° from Moon South Pole; Announcement of Opportunity specifies payload parameters: 300mm×150mm×150mm maximum physical dimensions, -180°C to 80°C lunar surface operating temperature, ≤10kg mass, ≤50W power consumption; Applicants to submit letter of intent by 1 Feb 2023 for 1 April preliminary selection, full proposals due 1 June 2023

Credits: CNSA

Tuesday / 4 Oct 2022

Swedish Space Corporation (SSC) Bolstering Global Ground Station Network Ahead of Lunar Mission Demands

Ka-band (26 GHz) deep space communication facilities in Chile and Australia to be added to SSC 10-station grid including Esrange (Sweden, 68°N), Inuvik (Canada, 68°N) Siracha (Thailand, 13°N), Clewiston (Florida, 26°N) South Point ‘Pete Conrad’ Ground Station (Hawaiʻi, 19°N), WASC (Australia, 29°S) and Santiago (Chile, 33°S); SSC to provide service for CLPS providers Astrobotic and Firefly during upcoming Peregrine (NET Q4 2022) and Blue Ghost (NET 2024) landing missions; SSC partnering with CNES, Safran Data Systems of France on new antenna systems and support

Pictured: SSC CEO Stefan Gardefjord, CNES Director of Strategy Jean-Marc Astorg; Credits: SSC, Twitter

Weekend Edition
Fri-Mon / 30 Sep – 3 Oct 2022

Autumn Moon Missions Striving Toward Launch While 2023 Queue Grows

NASA Artemis 1 cryogenic hydrogen fueling / tanking systems undergoing refurbishment, Flight Termination batteries being swapped in VAB, November launch to lunar DRO probable; ispace likely to lead commercial Moon lander efforts with launch window open Nov 11-15; Astrobotic holding to Q4 timeframe pending Blue Origin BE-4 certification / integration with ULA Vulcan Centaur; Intuitive Machines aiming for Q1 2023 as is ISRO Chandrayaan-3, JAXA SLIM; Roscosmos Luna 25 may launch July 2023; IM-2 / Lunar Trailblazer rideshare NET 2023

Credits: NASA, ispace, Astrobotic, IM, ISRO, JAXA, Roscosmos

Friday / 30 Sep 2022

Japan Spacecraft at Forefront of Lunar Return with ispace Lander, Cubesat Rideshares on Artemis 1

ispace HAKUTO-R mission reportedly targeting 9-15 November launch to Lacus Somniorum (Lake of Dreams) via SpaceX Falcon 9; ispace lander to deliver Rashid rover and collect regolith for sale to NASA under precedent-setting US$5,000 contract in accordance with Outer Space Treaty 1967; JAXA 6U CubeSats OMOTENASHI (Hospitality) and EQUULEUS to deploy from Artemis 1 Orion Stage Adapter, perform critical trajectory maneuvers to pathfind Earth-Moon L2 libration orbit and achieve semi-hard (~30 m/s) landing; OMOTENASHI retrorocket / airbag surface delivery system may serve as low-cost model for future Moon surface payloads

Pictured: (L-R) ispace CFO Jumpei Nozaki, ispace CEO Takeshi Hakamada, NASA Deputy Associate Administrator for Business Operations Casey Swails, ispace EU Director Julien-Alexandre Lamamy; Credits: NASA, JAXA, ispace

Tuesday / 27 Sep 2022

ESA to Send 2 Astronauts to Lunar Gateway, 1 to Moon Surface with NASA / Artemis Program by End of NLT 2029

Joint Statement on Lunar Cooperation Activities, signed by ESA Director Aschbacher / NASA Administrator Nelson, outlines Europe contributions – Service Module for Orion, I-HAB and ESPRIT modules for Gateway; At least 3 seats for ESA Astronauts secured in exchange: 2 Astronauts on orbital missions, likely Artemis 4 (NET 2027) & Artemis 5 (NET 2028), 1 on later surface mission TBD; Candidates for Europe Moon Astronauts include Samantha Cristoforetti (IT), Thomas Pesquet (FR), Tim Peake (UK), Alexander Gerst (DE), Matthias Maurer (DE), Luca Parmitano (IT) and Andreas Mogensen (DK)

Pictured (L-R): ESA Director Josef Aschbacher, NASA Deputy Administrator Pam Melroy, NASA Administrator Bill Nelson; Credits: ESA, NASA, Twitter

Weekend Edition
Fri-Mon / 23-26 Sep 2022

International Assortment of Robotic Landers Preparing for Launch to Lunar Surface

ispace Hakuto-R reportedly set to launch on SpaceX F9 during 9–15 Nov window, carrying UAE Rashid 1 rover to Moon on 3-month low-energy trajectory; Astrobotic holding to Q4 Peregrine launch amid USSF statement that BE-4 successfully demonstrated full engine performance, raising hopes for timely integration with ULA Vulcan Centaur launch vehicle; Intuitive Machines aiming for Q1 2023 Nova-C launch via SpaceX F9; ISRO Chandrayaan-3 to launch on GSLV NET Feb 2023; JAXA SLIM targeting March 2023 for launch on H-IIA

Credits: JAXA, IM, Astrobotic, ISRO, ispace

Friday / 23 Sep 2022

Artemis and Starship: Mega Rockets Intended for Human Moon Exploration Advance Towards Flight

NASA to update on cryogenic tanking test which saw 7% hydrogen leak from 20-cm seal largely mitigated by reducing fueling pressure at 23 Sep press briefing; Next launch opportunity 27 Sep pending weather & flight termination system battery waiver; Starship ‘Ship 24’ and Super Heavy ‘B7’ prototypes to undergo full stack WDR / hot fire testing at SpaceX Starbase in TX, from which possible October or likely November orbital test launch is to occur, with B7 splashing down in Gulf of Mexico and Ship 24 soft landing in Pacific 100-km NW of Kauaʻi

Credits: NASA, SpaceX

Tuesday / 20 Sep 2022

Moon South Pole is Target for Increasing Number of International Robotic and Human Missions 2023-28

CLPS provider Intuitive Machines to redirect IM-1 mission NET Q1 2023 from mid-latitude to MSP at NASA request, IM-2 already slated for Shackleton Connecting Ridge (89.5°S); ISRO Chandrayaan-3 targeting 71°S NET Feb 2023; Roscosmos Luna-25 aiming for 70°S NET 2023; Astrobotic to deliver VIPER rover to 85°S NET Nov 2024; CNSA Chang’E-7 to land near (L-R) Shackleton (90°S), Nobile (85°S) or Haworth (87°S) craters NET 2026; Artemis 3 to target 1 of 13 regions within 6° of MSP via SpaceX HLS; 6.25-day Polar Sortie Mission and 33-day Polar Excursion Mission on 2nd HLS to be awarded May 2023, launch NET 2028

Credits: NASA, IM

Weekend Edition
Fri-Mon / 16-19 Sep 2022

IAC73 Gathers Lunar Exploration Community, Optimal Landing Sites Including 4,990-m Malapert Under Consideration

Engaging 6,500+ world space professionals, International Astronautical Congress 2022 in Paris will be site of numerous high-level discussions during first Moon Exploration session 19 Sep: (L-R) Tatsuaki Hashimoto of JAXA to update on Omotenashi 6U CubeSat / micro-lander, to be deployed by Artemis 1; Daniel Andrews of NASA to share news on VIPER launching NET 2024; Steve Durst of ILOA Hawaii to present 5 Moon Missions September 2022 Update and rally support for prime South Pole landing area with Malapert Mountain: Moon High Ground Point E Awaits Landers interactive presentation

 

Credits: NASA, JAXA, ILOA

Friday / 16 Sep 2022

Capstone Team Working “Around the Clock” to Restore Spacecraft to Nominal Operational State

Advanced Space, Terran Orbital, and NASA focused on correcting anomalous behavior of ~US$30M Capstone, currently deemed stable, on trajectory to achieve lunar Near Rectilinear Halo Orbit and in communication with Deep Space Network, however still tumbling in safe mode after losing attitude control and comms in event associated with 8 Sep Trajectory Correction Maneuver 3; Sufficient solar power being generated to heat 8-thruster hydrazine propulsion system built by Stellar Exploration; Recovery operation may be possible, utilizing thrusters if 5° C thermal stability is achieved for 12 hours

Credits: NASA, Advanced Space