Weekend Edition
Fri-Mon / 20-23 Jan 2023

2 Newly Arrived Moon Orbiters May Be Joined by at Least Half-Dozen Landers in Coming Months

As NASA / Advanced Space Capstone continues pathfinder mission of NRHO (so far finding Δv orbital maintenance requirements to be substantially less than expected) and KPLO Danuri prepares to begin science operations in Feb, ispace Hakuto-R lander should start return towards cislunar space after having reached furthest point in nearly 5-month fuel-efficient trajectory (1,400,000 km); Astrobotic PM-1 (with Project Kuiper and Celestis) and Intuitive Machines IM-1 (with DOGE-1) to follow NET Q1 2023, JAXA SLIM (with XRISM) NET April, ISRO Chandrayaan-3 NET June, Roscosmos Luna-25 NET July

Credits: JAXA, ISRO, Roscosmos

 

Tuesday / 17 Jan 2023

3 Commercial Moon Landers: ispace Hakuto-R, Astrobotic Peregrine, Intuitive Machines Nova-C

First wave of independent Moon missions (following SpaceIL Beresheet attempt 2019) targeting lunar surface are underway / preparing for launch including ispace Mission 1 with Hakuto-R nearing furthest point from Earth (1,400,000 km) on ~5 month low-energy trajectory NET 20 Jan; Astrobotic Peregrine Mission 1 to make 7-58 day transit (3-33 cruise + 4-25 lunar orbit, dependent on launch date) NET Q1 on ULA Vulcan Centaur rocket, currently en route from Decatur AL via Mississippi barge to CCSFS; Intuitive Machines IM-1 to launch on SpaceX F9 from KSC also NET Q1 on ~6-day direct transfer

Credits: ispace, IM, Astrobotic, NASA

Weekend Edition
Fri-Mon / 9-12 Dec 2022

Orion Return is Beginning of New Era of Lunar Exploration as 2023 Commercial and National Moon Mission Prepare

Mission team including Landing / Recovery Director Melissa Jones, Entry Flight Director Judd Frieling now planning to recover Orion capsule near Guadalupe Island, ~241 km from Baja California coast following 11 Dec 09:40 PST splashdown; Just 10 hours prior, ispace HAKUTO-R lander is to launch to Moon from CCSFS (02:38 EST); CLPS missions from Intuitive Machines and Astrobotic to follow NET Q1 2023, JAXA SLIM NET April, ISRO Chandrayaan-3 NET June; Artemis 2 circumlunar crewed mission NET May 2024, SpaceX uncrewed demo mission and crewed dearMoon NET 2024

Credits: Astrobotic, Blue Origin, NASA

Friday / 9 Dec 2022

Peregrine Testing Advances, Astrobotic Joins Blue Origin-led Sustaining Lunar Development Team

Astrobotic Peregrine 120-kg payload class (35 kg dedicated commercial) lunar lander currently undergoing electromagnetic compatibility / interference testing at 32-acre Dayton T. Brown lab with thermal vacuum testing to follow; Aerotech Inc to integrate Peregrine into payload fairing of ULA Vulcan Centaur at CCSFS; PM1 reportedly launching first half of 2023 to either Lacus Mortis (45.13°N, 27.32°E) or Gruithuisen Domes (36.56°N, 40.72°W); Astrobotic now member of ‘National Team’ vying for NASA SLD human / cargo lander (uncrewed demo NET 2026) contract with Blue Origin, Draper, Honeybee, Boeing, Lockheed Martin

Credits: Astrobotic, Blue Origin, NASA

Weekend Edition
Fri-Mon / 2-5 Dec 2022

Wave of Independent Moon Missions to Trail Artemis 1, Followed by National Efforts, Then Another Raft of Indies

As NASA / ESA Orion Moonship returns to Earth, Advanced Space-controlled, Tyvak-built, NASA-funded Capstone remains in NRHO and Korea Pathfinder Lunar Orbiter Danuri on course to reach Moon orbit 16 Dec, planned commercial missions include ispace M1 awaiting SpaceX launch at KSC pending F9 review; Intuitive Machines IM-1 March 2023; Astrobotic PM1 Q1 2023; Followed by national missions from JAXA (SLIM, April 2023), ISRO (Chandrayaan-3, June 2023), Roscosmos (Luna-25, July 2023); Independents IM-2 (late 2023), SpaceX landing demo mission (2024), IM-3 (Q2 2024), Astrobotic GM1 (Nov 2024)

 Credits: NASA, ISRO, KARI, IM, SpaceX, Astrobotic,

Thanksgiving Holiday Edition
Wed-Mon / 23-28 Nov 2022

8 International Lunar Missions May Follow Artemis 1, Capstone, Danuri in Remainder of 2022 and 2023

As Artemis Orion spacecraft occupies cislunar distant retrograde orbit (130 x 64,000 km) with splashdown expected 11 Dec, NASA Capstone tests cislunar near rectilinear halo orbit (1,600 x 70,000 km) and KARI Danuri on course to reach 100km lunar orbit 16 Dec, numerous global efforts work to follow with ispace M1 launching NET 29 Nov 2022; Throughout 2023: Astrobotic Peregrine Mission One NET Q1, Intuitive Machines IM-1 NET March, JAXA SLIM NET April, ISRO Chandrayaan-3 NET June, Roscosmos Luna-25 NET July; IM-2 and Turkish Space Agency AYAP-1 aim for late 2023

Credits: NASA, KARI, Astrobotic, IM, JAXA, ISRO, TSA

Friday / 4 Nov 2022

Astrobotic PM1 Advances with Precision Landing Validation as BE-4 Engines Being Integrated on Vulcan Centaur

100-km test flight of Optical Precision Autonomous Landing system aboard King Air B200 twin turboprop confirms functionality 9 km above mountainous northern region of Mojave Desert analogous to lunar surface while providing Astrobotic with data to be utilized for US$79.5M Peregrine Mission 1 to Lacus Mortis (NET Q1 2023) and $320.4M Griffin Mission One to Nobile Crater (NET Nov 2024); Meanwhile Blue Origin working with ULA to complete Vulcan Centaur launch vehicle with BE-4 LNG / LOX (“methalox”) engines at Decatur, Alabama ULA facility

Credits: Astrobotic, ULA

Weekend Edition
Fri-Mon / 21-24 Oct 2022

Multiple International Lunar Missions Prepare to Launch as CAPSTONE and Danuri Near Lunar Orbit

NASA CAPSTONE mission team preparing to execute TCM-4 with possibility of ongoing thruster malfunction, spacecraft to enter lunar halo orbit NET 13 Nov; KARI Danuri following on similar low-energy route, to achieve lunar orbital (100km) insertion NET 17 Dec; Uncrewed Artemis 1 launch window to lunar flyby opens for 69 minutes at 00:07 EST on 14 Nov from KSC, where ispace is also aiming for M1 lander launch 9-15 Nov and NASA is prepping Orion heat shield for use in Artemis 3; Astrobotic Peregrine, Intuitive Machines Nova-C NET Q1 2023; Roscosmos Luna-25 NET July 2023; ISRO now targeting NET June 2023 launch of Chandrayaan-3 Moon lander / rover

Credits: NASA, Advanced Space, IM, Astrobotic, KARI, ISRO, Lockheed Martin

Weekend Edition
Fri-Mon / 14-17 Oct 2022

2023 Lunar Missions on the Horizon as Artemis 1 Flyby and M1 Lander Preparing for Launches

NASA and ispace poised for 2022 Moon flyby / robotic landing, while several missions now targeting 2023; Astrobotic, Intuitive Machines, ISRO, JAXA to launch Peregrine, Nova-C and Chandrayaan-3, SLIM landers NET Q1; Roscosmos plans Luna-25 launch via Soyuz-2.1b NET Q3; Also within 2023 Intuitive Machines striving to launch IM-2 mission including first satellite of lunar data relay ‘Khonstellation’, μNova hopper, SHERPA-ES tug, Orbit Fab Tanker-002 in-space fuel depot; Rocket Factory Augsburg to begin deployment of Harmony cislunar constellation; SpaceX to take Yusaku Maezawa and 8 selected crew, 1-2 professional astronauts on dearMoon lunar flyby with Starship

Credits: ISRO, SpaceX, RFA, dearMoon

Weekend Edition
Fri-Mon / 23-26 Sep 2022

International Assortment of Robotic Landers Preparing for Launch to Lunar Surface

ispace Hakuto-R reportedly set to launch on SpaceX F9 during 9–15 Nov window, carrying UAE Rashid 1 rover to Moon on 3-month low-energy trajectory; Astrobotic holding to Q4 Peregrine launch amid USSF statement that BE-4 successfully demonstrated full engine performance, raising hopes for timely integration with ULA Vulcan Centaur launch vehicle; Intuitive Machines aiming for Q1 2023 Nova-C launch via SpaceX F9; ISRO Chandrayaan-3 to launch on GSLV NET Feb 2023; JAXA SLIM targeting March 2023 for launch on H-IIA

Credits: JAXA, IM, Astrobotic, ISRO, ispace