Friday / 9 January 2026

Artemis Human Landings Anticipated with Preparatory FLIP, then FLEX Rovers

Launching NET July 2026 via 63,800kg-capacity Falcon Heavy, under NASA-CLPS US$322M award, Astrobotic Griffin-1 lander with 625kg capacity targets Nobile Crater, ~85°S, 53°E; primary payload Venturi Astrolab 500kg FLIP rover testing hyper-deformable tires, telerobotic mobility, thermal resilience, dust mitigation for larger FLEX vehicle; ~1,000kg-capacity FLEX launches in HLS lander NET 2027 on 200,000kg-capacity Starship Super-Heavy; FLIP rover is critical pathfinder for sustainable lunar infrastructure, carrying Interlune instrument seeking H3 / water ice, as well as 40-micron-thin nickel disks with millions of images of human endeavors, and Space Age Publishing Company weekly Space Calendar and Moon Messages

Image Credits: Astrobotic, Astrolab, Arch Mission Foundation

Tuesday / 6 January 2026

2026 Proposed Moon Missions to Advance Science, Prepare for Human Landings

Artemis 2 launching NET 6 Feb for Moon flyby, presaging NET 2028 landing of first woman and possibly 1st person of color or non-USA citizen; “early” 2026 Blue Origin cargo lander Mark-1 to test tech for Artemis 3 human lander; Intuitive Machines IM-3 plans H1 2026 science mission to Reiner Gamma, 7.5°N; Astrobotic Griffin-1 targeting July for taking Astrolab FLIP rover and its payloads to Nobile Crater at South Pole; “late” 2026 has Firefly sending Blue Ghost 2 to far side with Elytra orbital for comms, and China dispatching Chang’E-7 with lander, rover and hopper to hunt volatiles near South Pole

Image Credits: NASA, Astrobotic, Astrolab

Friday / 5 December 2025

Some Push for Backup as Lunar Rover Selection Nears

One of 3 LTVs to be selected this month; allocating a second bidder funding through critical design review would provide insurance; 2 awards for spacesuits now has Axiom after Collins drop-out, 2 awards for commercial crew launches saw SpaceX leap ahead of Boeing; Initial awards of ~US$30M each in April 2024 allowed Intuitive Machines (IM), Lunar Outpost (LO), Astrolab to develop prototypes; for $4.6B full contract, selected vehicle must arrive on Moon by 2029 for Artemis services to 2039; IM and LO plan for Falcon 9 rocket and Nova-C lander, Astrolab plans Starship for launch/landing; Senate Commerce Committee votes on Isaacman nomination 8 December; full-Senate vote would follow, end-of-year adjournment scheduled 19 December

Image Credits: NASA, (l-r) Lunar Outpost, Astrolab, Intuitive Machines

Friday / 7 November 2025

3 Lunar Rovers: Alike Yet Different

NASA-specified Lunar Terrain Vehicle selection NET end-of-2025 for awards from total US$4.6B available; requirements include: minimum ~1250km yearly / ~19km daily operation while hauling ~800kg, robotic construction arm with interchangeable tools, remote / autonomous / driver operation, LIDAR / camera “vision”, NASA-developed electrodynamic dust shielding, micrometeorite shielding, several years’ life through temperatures +121° to -246°C; Lunar Outpost Eagle has joystick steering for seated Astronauts, 25kph top speed, Goodyear metal-mesh tires; Astrolab FLEX has joystick for standing operators driving front- or rear-forward, Venturi wheels of heated silicone / glass / steel, horseshoe chassis, system redundancy; Intuitive Machines Moon Racer has seated-joystick operation with handrail / winch entry, Michelin tires tested to -195°C, trailer-hauling system

Image Credits: NASA – Dave Scott on Apollo 15, (CW) Lunar Outpost, Intuitive Machines, Astrolab

Tuesday / 16 September 2025

Space Calendar Offers to Land Your Message on the Moon

15 September announcement from Space Age Publishing Company communicates it will carry customer names and 100-character messages to Moon surface via Astrolab FLIP mission, landing near south pole in Nobile region NET late 2025, and via International Lunar Observatory Association (ILOA) ILO-1 mission in 2027; US$50 is the nominal fee for a limited time, see SpaceCalendar.com/MoonMessage; ILO-1 mission is to initiate 2-way lunar communications, adding real-time images from its lunar surface telescope to the weekly Space Calendar, published since 1976 and landed on Moon via a CLPS lander on 22 Feb 2024; Canadensys to build ILO-1 instrument

Image Credits: Space Age Publishing Company, International Lunar Observatory Association

Friday / 8 August 2025

Agreement with Astrolab for Interlune Helium-3 Rover-Mounted Camera

Helium-3 lunar prospector Interlune will mount multispectral, multi-wavelength camera developed with NASA Ames on Astrolab FLEX Lunar Innovation Platform (FLIP) rover, headed to Nobile Crater ~85°S NET Q4 2025 on Astrobotic Griffin-1 lander, to seek titanium-rich ilmenite mineral correlated with helium-3; precursor for NET 2027 dedicated helium-3 mission, privately held Seattle-based Interlune has agreements for purchase by US Department of Energy and Maybell Quantum of Denver CO; estimated price for helium-3 is US$20 million per kg

Image Credits: Astrobotic, Astrolab, Interlune 

4-7 July 2025
USA Holiday Weekend Edition

International Lunar Observatory Association ILO-1 Flagship Mission to Fly on Astrolab FLEX Rover to Moon South Pole NET 2026

ILOA Hawai’i will have instruments for Milky Way Center observation and commercial 2-way communications mounted on light bar of Astrolab FLEX rover, targeted to launch on Starship NET Dec 2026 and land at 1 of 9 possible Artemis landing sites near Moon South Pole; aim is for at least 1 year of operations for ILO-1 payload to fulfill long-term astronomy, science and exploration goals, as well as provide commercial lunar broadcasting for Space Age Publishing Company / Space Calendar, and others

Credits: Astrolab, SpaceX, Smithsonian

Friday / 20 June 2025

Newly Announced Mona Luna European Lunar Rover Model Is at Paris Air Show

Venturi Space of Monaco shows 750kg, 2.5m x 1.64m rover Mona Luna to CNES, ESA, 300,000 at Paris Air Show; Venturi working with Astrolab of Hawthorne, California for NASA LTV rover, both have lunar-night-surviving batteries, Swiss-developed hyper-deformable wheels; Mona Luna travels 20kph, climbs 20° slopes, hibernates 14 days; remote-control enhanced by onboard AI; designed to reach Moon on ESA Argonaut lander launching on Ariane 6.4 NLT 2030 

Credits: Venturi Space

Tuesday / 6 May 2025

Astrobotic Technology Aims for Moon Landing by Dec 2025

Astrobotic Griffin-1 lunar lander Guidance, Navigation and Control (GNC) technologies critical for soft Moon landing show themselves reliably successful in Mojave CA test; rocks / small craters down to 15 cm detected and avoided by camera and LiDAR, in Hazard Detection and Avoidance and Terrain Relative Navigation systems; scan area ~1,000,000 sq m (>2,200 football fields) allows safest specific site and landing accuracy within 50 m radius; landing expected in Nobile region near Moon South Pole with Astrolab FLIP rover by end of 2025

Credits: Astrobotic Technology, NASA

Friday / 11 April 2025

NASA Expected to Choose 1 of 3 Lunar Terrain Vehicles (LTVs) This Year, Award US$4.6B

3 companies were tasked with building a Moon rover to support Artemis; Lunar Outpost Eagle seats 2 Astronauts in front, each wheel turns independently, screens show what several cameras see, there are tool and sample containers, it can be operated remotely; Astrolab / Venturi / Axiom LTV has 2 Astronauts standing at rear, storage containers for lunar samples; Intuitive Machines RACER holds 2 Astronauts, carries 400kg of cargo plus trailer with 800kg, offers remote control, engineered with 9 companies and input from Moonwalkers Charlie Duke and Harrison Schmitt

Credits: Space.com/Future/Brett Tingley, Astrolab, Intuitive Machines