Tuesday / 1 Aug 2023

Chandrayaan-3 on Course for Lunar Orbit Insertion Following Successful Trans Lunar Injection

ISRO lunar lander Chandrayaan-3 on 5-day cruise to lunar orbit, expected to arrive 5 Aug after set on its way with TLI maneuver firing at 1 Aug perigee (00:15 IST) commanded from ISRO ISTRAC facility in Bengaluru; India is set to become 4th nation to soft-land on Moon, and may become 1st to explore Moon South Pole region; Meanwhile origin of wreckage found near Jurien Bay, Western Australia affirmed by Australian Space Agency to be PSLV stage 3; ASA to store material for ISRO retrieval as obligations under the United Nations space treaties considered

Credits: ISRO

Weekend Edition
Fri-Mon / 28-31 July 2023

India Chandrayaan-3 Successful TLI Will Propel Craft to Join USA, PRC, S Korea in Cislunar Space; Soon Followed by Russia, Japan

Rounding out July ‘International Space / Moon Month’ is TransLunar Injection (18:30-19:30 UTC 31 July / 00:00-01:00 IST 1 August) planned for Chandrayaan-3, setting it on course for lunar orbit, lander / propulsion-module separation 17 Aug, lunar touchdown 23 Aug; Luna-25 and SLIM landers may be on track for NET 10 Aug and 26 Aug respectively, while commercial Astrobotic and Intuitive Machines hope for 2023 launches; Continually operating are: landers CE-3 & CE-4, rover Yutu-2, and orbiters LRO, ARTEMIS P1 & P2, CE-4 Queqiao, Chandrayaan-2, CE-5-T1 Service Module, CAPSTONE & Danuri

Credits: NASA, CNSA, KARI, ISRO, Advanced Space

Weekend Edition
Fri-Mon / 21-24 July 2023

India, Russia and Japan Landers to Summer on Moon as USA Commercial Outfits Aim for Autumn / Winter

Chandrayaan-3 lander (449 kg dry) on track for 5th / final Earth orbit raising maneuver to be performed by ISRO Telemetry, Tracking and Command Network from Bengaluru 25 July between 14:00–15:00 IST, followed by lunar transfer 31 July and landing on lunar surface 23 August 17:47 IST; Roscosmos Luna-25 (800 kg) set for 11 Aug launch with Moon landing NET 20 Aug, being promoted with ‘Sonota’ mascot; JAXA SLIM (190 kg) to launch 26 Aug, demonstrate computer vision-based precision landing system; CLPS providers Intuitive Machines and Astrobotic preparing for Q4 launches

Credits: ISRO, Roscosmos, JAXA

Tuesday / 18 July 2023

Chandrayaan-3 Operating Nominally as its Orbit is Raised in Preparation for Trans-Lunar Injection

ISRO is working to conduct next raising maneuver of Chandrayaan-3, which is currently maintaining 41,603 km x 226 km orbit; Apogee firing to occur 17 July between 14:00-15:00 IST will be 3rd of 5 such maneuvers prior to TLI, which is set for 31 July, followed by ~5.5-day transfer and Lunar Orbit Insertion around 5 Aug; Propulsion Module to maintain 100 x 100 km circular orbit while Vikram lander containing Pragyan rover to descend to MSP area surface from 100 x 30km lunar orbit

Credits: ISRO

Weekend Edition
Fri-Mon / 14-17 July 2023

India Moon Lander Launch Leads Wave of Back-to-Back-to-Back National Missions Headed to Moon

ISRO ~US$75M Chandrayaan-3 on Earth Centric Phase 1 of Moon transit, in which 5 orbital raising maneuvers are set to occur prior to Lunar Transfer Phase 2 and Moon Centric Phase 3-10 with lander & rover landing at MSP region (69.367°S, 32.348°E) NET 23 Aug and Propulsion Module placed in 100-km circular orbit; Roscosmos to launch Luna-25 on 11 Aug at 23:10 UTC with direct TLI route, possibly reaching MSP region landing site (69.545°S, 43.544°E) before Chandrayaan-3; JAXA Smart Lander for Investigating Moon (SLIM) “Moon Sniper” launching with XRISM space telescope 26 Aug at 00:34:57 UTC

Credits: ISRO, JAXA, Roscosmos

Weekend Edition
Fri-Mon / 7-10 July 2023

India Moon Landing Mission Chandrayaan-3 Set for Liftoff

The 3,900-kg Chandrayaan-3 spacecraft (lunar lander, propulsion module, rover) now encapsulated in LVM3 payload fairing as ISRO makes final preparations for 14 July, 02:35 IST launch from Satish Dhawan Space Centre – India citizens invited to register for Launch View Gallery, vantage from southern areas of Sriharikota island / Pulicat Lake also available; Landing in MSP region (69.37°S, 32.35°E) expected 23-24 August; Mission duration is 1 lunar day (~14 Earth days) nominal, however ISRO Chairman S. Somanath is hopeful of 2nd lunar day extended operations if lander / rover survive night and recharge via solar panels

Credits: ISRO, IISc Bangalore

Weekend Edition
Fri-Mon / 23-26 June 2023

India Aims for the Moon with Chandrayaan-3 and Artemis / Technology Partnership with USA

Chandrayaan-3 awaiting 8-day launch window opening 12 July at Satish Dhawan Space Centre / landing attempt at 4 x 2.4 km landing area at 69.367621°S, 32.348126°E; Science payloads to be utilized over 1-lunar day mission include Radio Anatomy of Moon Bound Hypersensitive ionosphere and Atmosphere (RAMBHA) to characterize near surface lunar plasma; India to enhance lunar & space capabilities via Artemis membership and steps outlined in New Technology Partnership for the Future section of document issued by White House, which calls for facilitation of technology transfer and export control reform

Pictured (L-R): U.S. State Dept Deputy Assistant Secretary for India Nancy Jackson, NASA Administrator Bill Nelson, India Ambassador to the United States Taranjit Sandhu, ISRO representative Krunal Joshi; Credits: NASA, ISRO
 

Weekend Edition
Fri-Mon / 16-19 June 2023

India and Russia Accelerating Quest to Pioneer Moon South Pole

ISRO Chandrayaan-3 lunar lander undergoing final integration with LVM-3 rocket at Satish Dhawan Space Centre and is slated for launch to Moon between 12 and 19 July followed by ~1 month cruise and landing at 69.37°S, 32.35°E with ≤ 2 m / sec final velocity touchdown; Roscosmos Luna-25 (47 years after Luna-24) is to follow NET 11 Aug launching from Vostochny Cosmodrome, with direct TLI route powered by Soyuz-2.1b with Fregat upper stage lasting only a few days until landing at 69.55°S, 43.54°E, just ~120km distant from Chandrayaan-3; Intuitive Machines Nova-C NET Q3, Astrobotic Griffin NET Nov 2024, NASA Artemis 3 NET Dec 2025, Chang’E-7 around 2026 also targeting MSP

Pictured: ISRO Chairman S. Somanath, Roscosmos Director Yury Borisov; Credits: ISRO, Roscosmos, Lavochkin
 

Weekend Edition
Fri-Mon / 9-12 June 2023

National Moon Missions Around World Making Final Preparations for Launch / Lunar Surface Landing Attempts

ULA Vulcan Centaur on track to launch Astrobotic Peregrine NET July following nominal static-fire test of BE-4 methalox first stage engines, upper stage anomaly investigation ongoing, flight qualification 98% done; ISRO targeting 1-week launch window starting 12 July for Chandrayaan-3; Roscosmos set to launch Luna-25 on 11 Aug; JAXA SLIM to launch NET September, with video updates to be released as completed lander is transferred JAXA Space Exploration Center (Sagamihara Campus) to Tanegashima Space Center; Intuitive Machines making significant testing progress, on track for 2023 Nova-C launch

Credits: Intuitive Machines, JAXA

Weekend Edition
Fri-Mon / 19-22 May 2023

7 National and Independent / Commercial Lunar Landers Expected to Launch Within 1 Year

ISRO and Roscosmos targeting similar launch dates (NET 2nd week in July / 13 July respectively) and landing locations in Moon South Pole region (N / NE of Boguslavsky crater ~118km apart), for Chandrayaan-3 and Luna-25 landing missions, however Soyuz 2.1b will carry Luna-25 to direct TLI over a few days, whereas CY-3 will perform a series of Oberth raising maneuvers following LVM3 launch, resulting in ~1 month trip to orbital insertion; Astrobotic Peregrine, IM Nova-C, and JAXA SLIM striving for NET Q3 launch, IM-2 early 2024, Chang’E-6 NET May 2024

Credits: JAXA Lunar and Mars Exploration Logo Contest / Twitter @jsec_jaxa_jp