Yutu-2 Moon Rover On Route to Investigate Unusual Rectangular Object within Von Karman Crater
The first mission to explore surface of the lunar far side, already traversing ~840m, soon reaching 3rd full year since landing 3 Jan 2019, has sighted a novel structure on 36th lunar day and is now in transit to it, ~80m distant from present location NW of Chang’e-4 lander, as reported by Andrew Jones via Our Space of China; While natural origin / geological formation is assumed, SETA advocates such as James Benford argue that lunar artifacts may be viable source of ET clues
Crewed Launch Vehicle Being Developed By China Aerospace Science and Technology Codenamed 921, Reference To Chinese National Manned Space Program (Shenzhou) 1992 Founding Date, May Be More Timely Alternative Than Super Heavy Lift Vehicle Long March 9 To Achieve China Human Moon Landing; LM-9 Most Recent Design Iteration Calls For 10.6-m Diameter Core Stage With 16 YF-135 Engines Sans Auxiliary Boosters, Suggestive Of Reusability Goals; ‘921 Rocket’ Speculated To Be Designated Long March 5DY And Could Be Used To Ferry Crew To TLI With 2-Craft Configuration By 2025
Collaboration On Lunar Surface Missions 2021-25 Offered To World Space Community By ILRS Partners China And Russia, With Roscosmos Director General Dmitry Rogozin Telling State Media TASS “We Are Actively Negotiating With Many Participants”, Specifically ESA; ISRO Also Being Courted; Proposals Of Cooperation Opportunity Include Space Mission, Space System, Subsystem, Equipment, Ground & Application; Data Sharing / Analysis Available For CE-4, CE-6, Luna-25, Luna-27; Engineering And Mission Planning Coordination Possible For CE-7, CE-8, Luna-26, Luna-28; International / Independent Cooperation Could Accelerate Human Moon Landings This Decade
~US$10B Authorization For “Dissimilar Redundant” 2024 Human Landing System Award, Widely Speculated To Be In Response To Blue Origin GAO Protest Over Blue Moon Lander (L) Included In Innovation And Competition Act Containing NASA Authorization; Amended By Commerce Committee Chair Senator Maria Cantwell; Meanwhile Roscosmos Prime Contractor RSC Energia Continues Construction On 18 m3 Orel ‘Eagle’ (TR) And CNSA Contractor CASC Plans Next Test Of 13 m3 Next-Generation Crewed Spacecraft (BR) With Missions Slated For Late 2020s

As Chang’e-5 Begins Extended Solar Observation Mission With Bearing Toward Sun-Earth L1 Point, Princeton Professor Emerita Anne-Marie Slaughter (L) Makes
Chang’e-5 / Phase 3 Of CLEP Achieves Successful Transport Of 2kg Surface Regolith + 0.5kg Subsurface (1.8m Depth) From Oceanus Procellarum To Inner Mongolia Via High Speed Skip Retry; Recovered From Remote Tundra By Team Outfitted With 4kg Exoskeleton Suits, Providing 10% Strength Assist, And Joined By Curious Rabbit; First Samples Procured Since 170g From Luna 24 To Be Followed By Commercial / National Robotic And Human Efforts; International Collaboration On Analysis Invited, Chang’e-6/7/8 And Phase 4 Lunar Research Base Build-Out To Commence, Per Deputy Commander Wu Yanhua
Wenchang SLC On Hainan Island Is Center Of Preparatory Activity For 24 Nov Chang’e-5 Launch: Testing, Assembly, LM-5 Launch Vehicle Integration; Built By CAST For CNSA, Chang’e-5 23-Day Mission Comprised Of Orbiter, Lander, Ascender And Returner;
Collaborative ESA