Friday / 12 Aug 2022

NASA Mega Moon Rocket Inaugural Flight Approaches as Astronaut Corps Trains for Lunar Orbit NET 2024

Long-awaited USA flagship spacecraft Artemis 1, comprised of $US23B+ Boeing / Northrop Grumman developed Space Launch System (SLS) and $20B+ / 4-crew Lockheed Martin Orion capsule slated to roll out to LC-39B at KSC 18 Aug ahead of 29 Aug launch to Moon; 42-day mission includes 4-day outbound phase, 6-day retrograde orbit; 5-m diameter, 186-piece AVCOAT heatshield must withstand 2,760°C while travelling 11 km/s upon reentry, a record for human-rated craft; “Any one of our 42 active astronauts is eligible” for Artemis 2/3 human Moon Missions, per Astronaut Office Chief Reid Wiseman

Credits: NASA

Tuesday / 9 Aug 2022

KARI Prepares to Conduct Science Operations from Moon Orbit with KPLO, Considering Lunar Outpost

Korea Pathfinder Lunar Orbiter is headed to 100-km polar orbit around Moon, powered by four 30-N Orbit Maneuver Thrusters on ~ 19-week journey; 6 science instruments include Gamma Ray Spectrometer to monitor y-ray emissions during trip / from lunar orbit within 10 keV to 10 MeV range; NASA ShadowCam based on LRO LROC with 800x sensitivity to map PSRs; Ministry of Science official Kwon Hyun-joon tells NYT Moon has “potential to act as a base for further deep space exploration”; 2nd stage of Korean Lunar Exploration Program to feature lunar orbiter / lander / rover launched from S Korea NLT 2030

Credits: KARI, SpaceX, Yonhap

Weekend Edition
Fri-Mon / 5-8 Aug 2022

Danuri and Capstone on Course Towards Lunar Orbit as Artemis 1 and Landers Prepare to Follow

Summer around Moon well underway with KARI KPLO Danuri joining NASA Capstone (operated by Advanced Space) on fuel efficient ballistic lunar transfer trajectory; Danuri expected to reach Moon orbit by 16 Dec, Capstone to arrive 13 Nov; NASA Artemis 1 (SLS megarocket + Orion crew capsule) to take direct 4-day trans-lunar injection route, rollout to KSC pad 39B anticipated 19 Aug, nominal launch date set for 29 Aug; ispace Hakuto-R targets launch to Lacus Somniorum ‘Lake of Dreams’ in Nov; Astrobotic Peregrine working towards Q4 launch to Lacus Mortis ‘Lake of Death’

Pictured: KARI Director Lee Sang-ryool, Advanced Space Capstone Program Manager Tom Gardner; Credits: KARI, Advanced Space, APRSAF

 

Friday / 5 Aug 2022

Astronomy from the Moon Presented at 31st IAU General Assembly in Busan, S. Korea

International Lunar Observatory Association (ILOA) to speak on the resumption of astrophysical investigation from the surface of Moon during Division A (Fundamental Astronomy) talk at 14:40 KST, just hours after Korea Pathfinder Lunar Orbiter Danuri set to launch at 8:08 KST; IM-1 carrying ILO-X to Moon NET Jan 2023 along with co-payload Radio Wave Observations at the Lunar Surface of the photoElectron Sheath (ROLSES); Future AFTM includes ILO-1 (NET 2024), LuSEE (2025), DAPPER, FARSIDE, Lunar Crater Radio Telescope

Credits: IAU, ILOA, NASA

Tuesday / 2 Aug 2022

First USA Mission to Lunar Far Side May Be Conducted via CLPS Program in 2025

Draper Laboratory to carry 3 NASA instruments to Schrödinger basin (75.0°S, 132.4°E) on lunar far side NET 2025 under 8th CLPS task order / US$73M contract; 2 Blue Canyon cislunar relay satellites to be deployed prior to landing and operated by Advanced Space; Draper team includes ispace, General Atomics, Systima Technologies; First USA mission to target lunar far side would mark 2nd nation to explore hemisphere after China; Anchor payloads include Lunar Surface ElectroMagnetics Experiment (LuSEE), Lunar Interior Temperature and Materials Suite (LITMS), Farside Seismic Suite (FSS)

Credits: NASA, Draper Labs

Weekend Edition
Fri-Mon / 29 July – 1 Aug 2022

Summer Around Moon Continues with Korea Pathfinder Lunar Orbiter Launching 4 Aug

NASA Capstone performing nominally on voyage to Moon with trajectory correction maneuver 3 expected to be performed by Advanced Space in early September, reach NRHO NET 13 Nov; KPLO Danuri targeting 4 Aug launch on SpaceX F9 from KSC; NASA Artemis 1 prepping for 29 Aug launch to DRO; Autumn landers include ispace Hakuto-R carrying UAE Rashid rover on track for Nov launch to Lacus Somniorum (37.56°N, 30.8°E) with US$37M cash infusion from consortium of Japan banks; Astrobotic Peregrine and Intuitive Machines Nova-C CLPS landers racing to land on Moon before EOY

Credits: NASA, KARI, IM, Astrobotic, Lockheed Martin

Wednesday / 27 July 2022

Galaxy Forum Southeast Asia (GFSEA), Singapore Considers Lunar Commercial Communications, Pan Asia Astro Cooperation

GFSEA engaging regional astronomical / astronautical space leaders in dialogue at iconic ArtScience Museum 27 July on 3 themes: Considerations for Southeast Asia Space Agency (SEASA), Asia Astronomy Organization (AAO) modeled on European Southern Observatories, and Lunar Commercial Communications (LCC) – expanding commercial communications by 1,240x; Moderated by Singapore Space and Technology Limited President Jon Hung, LCC panel includes International Lunar Observatory Association Hawaii Director Steve Durst, Qosmosys CEO Francois Dubrulle, Transcelestial Technologies Engineer Jan Smisek; ILOA ILO-X precursor NET 22 Dec 2022, ILO-1 flagship NET 2024 missions for astronomy, observations and communications from the Moon

Credits: ILOA, NASA, CSYS, Twitter, Linkedin

Weekend Edition
Fri-Mon / 22-25 July 2022

International Teams Prepare for Summer Around the Moon, Autumn on Lunar Surface

KARI KPLO / Danuri launching on SpaceX F9 to Moon orbit 2 Aug from KSC, arrival at 100-km lunar orbit expected 1 Jan 2023; NASA mega rocket SLS / Orion crew capsule Artemis 1 mission targeting 29 Aug, 2 Sep or 5 Sep for launch to 100-km Moon flyby / 61,155-km Distant Retrograde Orbit; ispace Hakuto-R Mission 1 aiming for November launch, Astrobotic striving to launch Peregrine lander within Q4, Intuitive Machines Nova-C may launch Dec 2022 or Jan 2023; Roscosmos Luna-25 and ISRO Chandrayaan-3 likely delayed to 2023

Credits: KARI, NASA, ispace

Tuesday / 12 July 2022

Space Habitat, Biome and Transport System Envisioned by Japan Academic / Industry Partnership

Kyoto University Human Spaceology Center teaming with Kajima Corporation to realize sustainable human occupancy of Moon, Mars, and interplanetary space; Comprehensive 3-part proposal includes 396-m Luna Glass, generating 1g artificial gravity via 20-second rotations, Nature biome extracted from global ecosystem, harnessing “natural capital”, and interplanetary Hexatrack transit which would ferry people to / from LEO station, cislunar Gateway, Mars moon Phobos and have modular capsule design for surface transport, hybrid electromagnetic railgun / chemical propulsion; Researchers estimate a precursor system could be constructed within 50 years, full build-out NET 22nd Century

Credits: Kyoto University / Kajima Corporation
 

Weekend Edition
Fri-Mon / 8-11 July 2022

New Lunar Era Underway with CAPSTONE On Route to Moon, Many Orbiters / Landers to Follow

Capstone Moon orbit pathfinder on nominal trajectory to achieve 4-body (Earth, Moon, Sun, Spacecraft) Ballistic Lunar Transfer; S. Korea Danuri orbiter next on Moon mission schedule, launching 2 Aug; NASA Mega Moon rocket SLS undergoing final prep with first Artemis 1 launch window open 23 Aug–6 Sep; Roscosmos Luna-25 lander tentatively set for late Sep; Window for ispace Hakuto-R carrying MBRSC Rashid rover open Oct-Nov; NASA CLPS providers Astrobotic and Intuitive Machines race to land Peregrine and Nova-C before EOY; SpaceX Starship 24 / Booster 7 on orbital launch pad at Boca Chica

Credits: NASA, Advanced Space