Australia / International Space Companies to Develop 2 Rover Prototypes for Moon to Mars Trailblazer Initiative

Launching to Moon NET 2026, Trailblazer rover program supported by commerce-centered Australian Space Agency with Stage 1 awards of AU$5M (US$2.7) to 2 industry consortia: AROSE led by Fugro (NL) / Nova Systems (AU) and group led by EPE (AU) / Lunar Outpost Oceania, subsidiary of Lunar Outpost (USA) with support from CO School of Mines, Saber Astronautics (AU); Coinciding with the announcement, NASA Administrator Nelson and Deputy Melroy tour Australia this week with stops at ASA HQ in Adelaide, Parliament House & National Press Club 23 March




Long-awaited USA flagship spacecraft Artemis 1, comprised of $US23B+ Boeing / Northrop Grumman developed Space Launch System (SLS) and $20B+ / 4-crew Lockheed Martin Orion capsule slated to roll out to LC-39B at KSC 18 Aug ahead of 29 Aug launch to Moon; 42-day mission includes 4-day outbound phase, 6-day retrograde orbit; 5-m diameter, 186-piece AVCOAT heatshield must withstand 2,760°C while travelling 11 km/s upon reentry, a record for human-rated craft; “Any one of our 42 active astronauts is eligible” for Artemis 2/3 human Moon Missions, per Astronaut Office Chief Reid Wiseman

Space Launch System, fully stacked with Orion spacecraft in Block 1 configuration stands 98 m tall / 8.4 m diameter at KSC FL; to undergo interface, stage systems, communications, countdown sequencing, wet dress testing prior to Artemis I inaugural uncrewed Moon flyby, launch window opening 12 Feb 2022; SN20 prototype at Starbase TX is 120 m high / 9 m diameter stacked; Elon Musk claims orbital test ending near Kaua’i HI NET November, with utilization of Mechazilla “robot chopsticks” affixed to launch tower to catch Super Heavy first stage