New Zealand May Lead Artemis Moon Fleet with Orbital Wayfinder CAPSTONE Cubesat in March

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment now scheduled to be first probe in USA-led Artemis Return to Moon; Launching to Earth orbit on Electron from Rocket Lab Launch Complex 1 located on Māhia NZ (39.2°S, 177.8°E) NET March under US$9.95M NASA contract; 12U, 25-kg cubesat will be delivered to TLI via Photon Kick Stage after 9-day elliptical orbit raising; 1600 x 70000 km polar near rectilinear halo orbit around Moon may provide optimal trajectory with minimal corrections (under 10 m/s ∆v) achievable with Maxar solar / electric propulsion element for Gateway (NET 2024)


New robotic landers are to join Chang’e-4 / Yutu-2 on lunar surface: NASA CLPS providers Intuitive Machines and Astrobotic lead Artemis Program with IM working on 2 Nova-C missions, IM-1 to Vallis Schröteri in Q1, IM-2 to Shackleton connecting ridge Q4; Astrobotic Mission One with Peregrine, likely mid-2022 per
Humanity is set on a return to the Moon, with two major efforts:
Beijing Research Institute of Uranium Geology studying 1,731g of regolith returned by Chang’e-5 for 3He, an isotope possessing 1 neutron / 2 protons used in medical diagnostics and cryogenics, and considered a fusion material candidate since 1986 by nuclear scientist Gerald Kulcinski, working in collaboration with Moonworker
Seeking to establish commercial access to the lunar surface, pilot phase of Lunar Transportation / Exploration Program began November 24 with MoU signing specifying 15-kg lander payload space / 5-kg rover payload space on missions beginning 2024 if ESA evaluation panel approves partnership NET 2022; Arrangement would see ispace landers launched on Ariane 6 rockets; ArianeGroup currently enjoys good working relationship with ispace EU, building propulsion elements for series 1 lander set for late 2022 launch on SpaceX Falcon 9 Block 5
As prospects of sustained operations on the Moon nears, unique orbital mechanics of Earth-Moon system draw attention of mission planners and
A world leader in terrestrial excavation technology,
The first mission to explore surface of the lunar far side, already traversing ~840m, soon reaching 3rd full year since landing 3 Jan 2019, has sighted a novel structure on 36th lunar day and is now in transit to it, ~80m distant from present location NW of Chang’e-4 lander, as