SLS ‘Mega Moon Rocket’ with Integrated Orion Spacecraft Prepares for Rollout / Wet Dress Rehearsal

Simulated countdown sequencing software / hardware test is last step before highly anticipated (12th year of $23B+ program) rollout of USA flagship Space Launch System from KSC Vehicle Assembly Building to historic Launch Pad 39B, as problematic RS-25 engine controller replaced and checked; Fueled dress rehearsal set to occur NET mid-Feb followed by hot fire and inaugural Artemis 1 uncrewed lunar flyby NET March; Elements of Artemis 2-4 crafts currently being manufactured with ULA Interim Cryogenic Propulsion Stage (Decatur AL) and Aerojet Rocketdyne RS-25 engines (New Orleans LA) being readied for KSC shipment





New robotic landers are to join Chang’e-4 / Yutu-2 on lunar surface: NASA CLPS providers Intuitive Machines and Astrobotic lead Artemis Program with IM working on 2 Nova-C missions, IM-1 to Vallis Schröteri in Q1, IM-2 to Shackleton connecting ridge Q4; Astrobotic Mission One with Peregrine, likely mid-2022 per
Humanity is set on a return to the Moon, with two major efforts:
Beijing Research Institute of Uranium Geology studying 1,731g of regolith returned by Chang’e-5 for 3He, an isotope possessing 1 neutron / 2 protons used in medical diagnostics and cryogenics, and considered a fusion material candidate since 1986 by nuclear scientist Gerald Kulcinski, working in collaboration with Moonworker
Seeking to establish commercial access to the lunar surface, pilot phase of Lunar Transportation / Exploration Program began November 24 with MoU signing specifying 15-kg lander payload space / 5-kg rover payload space on missions beginning 2024 if ESA evaluation panel approves partnership NET 2022; Arrangement would see ispace landers launched on Ariane 6 rockets; ArianeGroup currently enjoys good working relationship with ispace EU, building propulsion elements for series 1 lander set for late 2022 launch on SpaceX Falcon 9 Block 5