2024 Artemis Human Moon Lander Teams Clear Certification Baseline Reviews
NASA HLS Program Manager Lisa Watson-Morgan Oversees CBR Process, Customized To Establish Standards For Each Of 3 Unique Lander Designs: Traditional Approach By Blue Origin Group Awarded US$579M, Stripped-Down Strategy From Dynetics / 25+ Subcontractors Awarded $253M And Novel In-Space Refueling Method From SpaceX Initially Awarded $135M + $53M For Propellant Transfer Demonstration; Safety, Construction, Testing / Validation Considered; Watson-Morgan Is Confident That Diversity Of Design Advances “Bold And Challenging Objective Of Sending Astronauts To The Lunar South Pole”; ≤ 2 Option A Contracts To Be Issued NLT Feb 2021
Credits: NASA, SpaceX, Dynetics, Blue Origin
Astrobotic, A Private NewSpace Enterprise With Carnegie Mellon Origins, Has New Home Located In Historic Manchester Neighborhood Of Pittsburgh; Renovation Of 4,366-m2 Former Post Office Reportedly 1/3 Complete, Containing Space For Fabrication, Laboratories, Administration; Further Construction To Include Drone / Rover Testing Areas; US$79.5M Peregrine Mission Launching July 2021 To Lacus Mortis Area (44.96°N, 25.62°E) Of Moon Will Be Controlled From 1016 North Lincoln Ave, As Will 2 Moon South Pole Missions: $5.6M MoonRanger Rover (Carried By XL-1 Masten Lander Dec 2022) And $199.5M Griffin (To Deliver VIPER 2023)
Artemis III Science Definition Team To Present Findings Of
SOM Symposium Convenes 16 October 1500-1700 PDT With Theme ‘NASA Returns To The Moon, First Woman On The Moon / Artemis, And Astronomy From The Moon’; First Woman Astronaut On Moon / Beyond Could Be Stanford Alumni (10 To Date); Henning Roedel (’11) To Moderate With Speakers Including Astronaut Tammy Jernigan (’81), Grant Anderson Of Paragon Space (’85) And Astronaut Nicole Aunapu Mann (’01); Panel Discussion Including ILOA Director Steve Durst (’65) To Be Moderated By Loretta Hidalgo Whitesides (’96); Endowment Funds Awarded To SSO & SAS, Received By Prof Bruce Macintosh And Prof Roger Romani, Respectively
Part Of US$370M+ NASA Tipping Point Awards Announced By Administrator Bridenstine At LSIC 14 Oct, Nokia Of North America (Subsidiary Of Finland Parent Company) Granted $14.1M To Build Cis-Lunar LTE Network, A Highly Vital Component Of Artemis 2024 Human Moon Landing Plan And 2028 Moon Base Establishment; Nokia Had Planned To Launch Lunar Network In Conjunction With Vodafone, Audi And PT Scientists In 2018; Bridenstine Boldly Proclaims New Infrastructure Will Empower “Biggest, Broadest, Most Diverse Inclusive Coalition Of Researchers And Explorers In The History Of Humankind”
Lunar Surface Innovation Initiative, In Collaboration With Johns Hopkins Applied Physics Laboratory And Arizona State University Interplanetary Initiative, Hosts Lunar Surface Innovation Consortium 14 -15 Oct Online; NASA Administrator Bridenstine (L) To Give Keynote Address Wednesday At 11:45 EDT In Which Artemis 2024 Updates And Next Batch Of ‘Tipping Point’ Industry Partners For Development Of Sustainable Lunar Exploration Technology Are To Be Announced; Award Topics Include Cryogenic Fluid Management, Lunar Surface Power / Distribution And Propulsion; Private Partners Expected To Contribute ≥ 25% Of Program Costs
Wenchang SLC On Hainan Island Is Center Of Preparatory Activity For 24 Nov Chang’e-5 Launch: Testing, Assembly, LM-5 Launch Vehicle Integration; Built By CAST For CNSA, Chang’e-5 23-Day Mission Comprised Of Orbiter, Lander, Ascender And Returner;
Collaborative ESA
Intent On Gathering Data Relevant To Primordial Cosmology, Future Lunar-Based Astronomy Missions Were Presented By CU Boulder Professor Jack Burns At LEAG 2020: ROLSES, Set To Land On Moon In Oct 2021 As Part Of CLPS Carrier Intuitive Machines Nova-C Science Payload, Will Monitor 10 kHz – 10 MHz Spectrum With Antennae At 1 & 2 m Above Lunar Surface, Testing Response; LuSEE In 2024 Will Measure Electromagnetic Fields On Farside; DAPPER Orbiter Aims For 2025 And 10-km Diameter FARSIDE In Planning Stages Would Have Major SETI Potential