Tuesday / 18 April 2023

Starship Launch Slated for This Week, a Variant is to Carry First Human Moon Missions Artemis 3 / 4 to Surface

Starship in HLS form – minus aerodynamic fins / heat shielding, plus mid-body RCS thrusters – is to land uncrewed demo prior to carrying 2 Artemis astronauts from lunar orbit (transferred from Orion, launched by SLS) to surface near MSP under Option A US$2.89B contract NET Dec 2025 and Artemis 4 NET Sept 2028 under $1.15B Option B; Lunar missions to utilize ‘tanker’ and ‘depot’ scheme in which HLS will be refueled in NRHO; Artemis 5 onward to have TBD alternative lander under NextSTEP Appendix P

Pictured: SpaceX CEO Elon Musk, Starship Engineering Director Shana Diez, Starship Engineering VP Joe Petrzelka in Starship Mission Control; Credits: SpaceX, Twitter / @WalterIsaacson