Thanksgiving Holiday Edition
Thurs-Mon / 23-27 Nov 2023

A Robust International Moon Landing Schedule in First Half 2024

JAXA Smart Lander for Investigating Moon (SLIM) lander, Astrobotic Peregrine and Intuitive Machines Nova-C Odysseus are slated to land on near side of Moon NET Jan 2024: SLIM is currently in low-energy transfer targeting 100-m landing site near Shioli crater (13.3°S) mid-Jan, Peregrine awaiting ULA Vulcan Centaur launch from KSC NET 24 Dec with late Jan landing near Gruithuisen Domes (36.56°N), Nova-C working toward late Nov shipping from TX to FL for NET 12 Jan launch on SpaceX F9 to 5-7 day direct transfer for mid-Jan landing near Malapert-A (80.3°S); CNSA Chang’E-6 to launch on Long March 5 NET May 2024 to Apollo crater within far side SPA Basin (43.0°S)

Picutred: SLIM Project Manager Shinichiro Sakai, Astrobotic CEO John Thornton, IM CEO Stephen Altemus, CLEP Designer Sun Jiadong; Credits: JAXA, Astrobotic, Intuitive Machines, CNSA, Linkedin