Artemis Moon Exploration Advances with Increased Funding Proposal, Upcoming Crew and Spacesuits Reveal
Biden-Harris Administration fiscal year 2024 USA budget allocates US$27.2B for NASA, a 7.1% increase, with $8.1B for lunar exploration & $949M for Mars sample return; Artemis II 4-member crew to be announced at joint NASA / CSA-ASC joint press event at JSC Ellington Field 3 April, with astronaut interviews 4 April; Prototype Exploration Extravehicular Mobility Unit (xEMU) space suits for Artemis III lunar surface exploration being developed by Axiom / Raytheon subsidiary Collins Aerospace under $3.5B contract running through 2034 to be demonstrated 15 March at Space Center Houston
Landing near northern rim of Nassau crater on lunar farside (23.81°S, 176.83°E) on TBD commercial lander, Lunar Surface Electromagnetics Experiment-Night (LuSEE-Night) led by PI Stuart Bale (UC-Berkeley), co-investigator Jack Burns (CU Boulder) and DOE / Brookhaven National Lab is slated to be the first radio astronomy precursor to test low frequency detection limits (<50 MHz) in the pursuit of cosmological dark ages (380,000 years post-Big Bang) observation via 21-cm neutral hydrogen emissions; LuSEE-Night is to operate throughout lunar night / day cycle for up to 2 years thanks to 40-kg battery system
Under NASA NextSTEP-2 Appendix N US$45M award, Leidos subsidiary Dynetics has matured key equipment it hopes will strengthen its bid with partner Northrop Grumman for Appendix P: Human Landing System Sustaining Lunar Development & Demonstration contract / uncrewed & crewed demo missions around Artemis 5 or later (NET 2028); Tech validations include methalox main / RCS propulsion testing at MSFC, Cryogenic Fluid transfer demonstration at GRC, Electrodynamic Dust Shield modules (first created at KSC); Blue Origin-led team including Draper, Lockheed Martin, Boeing, Astrobotic, Honeybee Robotics also competing for Appendix P contract





