Tuesday / 1 Nov 2022

Lunar Flashlight to Prospect for Water on Moon, Launch with ispace Mission-1 NET 22 November

Utilizing 4 shortwave IR lasers (1.064, 1.495, 1.85, 1.99 μm) and indium gallium arsenide spectrometer, 6U / 14kg Lunar Flashlight 2-month nominal cubesat mission led by PI Barbara Cohen of NASA GSFC to search for water ice hidden within permanently shadowed regions on Moon from 15 x 70,000 km elliptical near-rectilinear polar orbit with ~6 day period; Lunar Flashlight now launching with Hakuto-R M1, which has arrived at KSC for launch on SpaceX F9 NET 22 Nov carrying UAE Rashid rover, Canadensys-built 360° cameras, JAXA spheroid robot

Credits: NASA, ispace, Wikipedia

Weekend Edition
Fri-Mon / 28-31 Oct 2022

NASA Economic Impact Study Shows US$71.2B Effect on Output, NASA OTPS Issues Lunar Exploration Policy Recommendations

While NASA itself employs some 19,000+ civil servants, its operations support an estimated 339,600 jobs nationally, per Economic Impact Report generated by IMPLAN modeling software, compiled by researchers at Voorhees Center in Chicago; Study estimates 1,000,000+ people in 90 nations employed in $469B global space industry; Lunar Landing and Operations Policy Analysis issued by Office of Technology, Policy, and Strategy identifies 7 lunar challenges / mitigation approaches: Landings, Surface Operations, Surface Movement, Radio-Frequency Interference, Areas with Special Characteristics, Unexpected Activities and Human Heritage Protection

 

Pictured: (TL-TR) Amanda Hernandez, Gabriel Swiney (NASA OTPS), (BL-BR) Yittayih Zelalem, Joshua Drucker, Zafer Sonmez (Voorhees Center); Credits: NASA, NSS, LinkedIn

Friday / 28 Oct 2022

Quantum Space Announces October 2024 Mission QS-1 to Earth-Moon-Lagrange Points 1 and 2 with Cislunar Superhighway Ambitions

NewSpace enterprise Quantum Space working toward self-funded launch of 400-kg satellite to collect space situational awareness data in cislunar space over 3-year mission; Main visible imager payload will be provided by GEOST, spacecraft bus to be built by Blue Canyon which will carry commercial customer payloads; Co-founded by Kam Ghaffarin (L), who also is Founder of IBX, Executive Chair at X-energy, Intuitive Machines & Axiom Space; QS-1 to utilize commercial deep space ground stations, modular cislunar communication / servicing waystations to follow

Also Pictured: Quantum Space CEO Steve Jurczyk, CTO Ben Reed;
Credits: NASA, X-Energy, IAF,
Quantum Space
 

Tuesday / 25 Oct 2022

Artemis Moon Return Advances with Analog Training, 3 Orion Capsules on Order as Cost Transparency Urged

NASA analyzing data gathered by NASA / JAXA Astronauts Drew Feustel, Zena Cardman, Jessica Meir, Stan Love, Akihiko Hoshide, Norishige Kanai during nighttime Moonwalk simulation (JETT field test #3) and 3-day pressurized rover sojourn (D-RATS) near Flagstaff AZ; Lockheed Martin to build Orion additional crew capsules for Artemis missions 6-8 at cost of US$1.99B; Wayne Hale of NASA Advisory Council recommends PPP contract details be public, expresses concern on program architecture and 1-way Starship landing test; Former NASA Administrator Jim Bridenstine joining Advisory Board of CLPS provider Firefly

Credits: Lockheed Martin, NASA

Weekend Edition
Fri-Mon / 21-24 Oct 2022

Multiple International Lunar Missions Prepare to Launch as CAPSTONE and Danuri Near Lunar Orbit

NASA CAPSTONE mission team preparing to execute TCM-4 with possibility of ongoing thruster malfunction, spacecraft to enter lunar halo orbit NET 13 Nov; KARI Danuri following on similar low-energy route, to achieve lunar orbital (100km) insertion NET 17 Dec; Uncrewed Artemis 1 launch window to lunar flyby opens for 69 minutes at 00:07 EST on 14 Nov from KSC, where ispace is also aiming for M1 lander launch 9-15 Nov and NASA is prepping Orion heat shield for use in Artemis 3; Astrobotic Peregrine, Intuitive Machines Nova-C NET Q1 2023; Roscosmos Luna-25 NET July 2023; ISRO now targeting NET June 2023 launch of Chandrayaan-3 Moon lander / rover

Credits: NASA, Advanced Space, IM, Astrobotic, KARI, ISRO, Lockheed Martin

Tuesday / 18 Oct 2022

Moon Village Association and Beyond Earth Institute Advance Lunar Sustainability and Habitation

MVA Global Expert Group on Sustainable Lunar Activities (GEGSLA) meeting for 21st time on 19 October to formulate recommendations on sustainable governmental and independent Moon exploration best practices to be presented to United Nations Committee on the Peaceful Use of Outer Space; Meeting will conclude ‘Consensus Phase’, with ‘Harmonization Phase’ to follow for next 2 meetings (16 Nov, 21 Dec); Beyond Earth Institute also promotes guidelines for political, economic and environomental sustainability in paper Toward A Cislunar Ecosystem With Human Presence: The Underpinning For Permanent Lunar Communities

Credits: MVA, BEI

Weekend Edition
Fri-Mon / 14-17 Oct 2022

2023 Lunar Missions on the Horizon as Artemis 1 Flyby and M1 Lander Preparing for Launches

NASA and ispace poised for 2022 Moon flyby / robotic landing, while several missions now targeting 2023; Astrobotic, Intuitive Machines, ISRO, JAXA to launch Peregrine, Nova-C and Chandrayaan-3, SLIM landers NET Q1; Roscosmos plans Luna-25 launch via Soyuz-2.1b NET Q3; Also within 2023 Intuitive Machines striving to launch IM-2 mission including first satellite of lunar data relay ‘Khonstellation’, μNova hopper, SHERPA-ES tug, Orbit Fab Tanker-002 in-space fuel depot; Rocket Factory Augsburg to begin deployment of Harmony cislunar constellation; SpaceX to take Yusaku Maezawa and 8 selected crew, 1-2 professional astronauts on dearMoon lunar flyby with Starship

Credits: ISRO, SpaceX, RFA, dearMoon

Friday / 14 Oct 2022

ispace Counting Down to Mission 1 Launch, Hoping to Achieve First Successful Commercial Lunar Lading

M1 lander with integrated payloads from NGK (solid-state battery), Canadensys (360° cameras), UAE Rashid rover, JAXA transformable lunar robot to depart testing site IABG Space Centre in Ottobrunn, Germany for KSC LC-39, launching as secondary rideshare on SpaceX F9 rocket NET 9-15 November window; 3-month low-energy lunar transfer, tracked by ESA ESTRACK ground stations in Guiana, Australia, Spain, Argentina and UK, to be followed by 12-day lunar mission; 200+ employee ispace has US$237M+ funding, planning M2 NET 2023, M3 with Draper under $73M CLPS award NET 2025

Credits: ispace, MBRSC

Tuesday / 11 Oct 2022

Cislunar Development Policy to be Discussed at Beyond Earth Symposium 12-13 Oct

34 featured speakers in space policy, academia and industry to consider guidelines conducive to long-term human community & economy in space and on / around Moon at hybrid conference hosted by University of Arizona Center for Outreach & Collaboration in Washington DC; Toward a Cislunar Ecosystem with Human Presence panel on 13 Oct will be moderated by (L-R) Laura Forczyk (Beyond Earth Institute), feature speakers Scott Pace (George Washington University), Paul Stimers (K&L Gates), Vishnu Reddy (University of Arizona LPL), John Mankins (Moon Village Association) and Angeliki Kapoglou (ESA); In-person ($345) and online ($49) registration available here

Credits: BE, University of Arizona

Weekend Edition
Fri-Mon / 7-10 Oct 2022

Stalwart Lunar Reconnaissance Orbiter Continues to Contribute to Cutting Edge Moon Science and Exploration

Team led by Vishnu Viswanathan of NASA Goddard Space Flight Center manipulate LOLA data to determine effect of asteroid impacts that created 5,200 Moon craters 20–1,200m in diameter over 4.25B years on True Polar Wander; Modeling suggests 10° / 300km variance, with implications for polar water ice location; LRO also actively in use for commercial exportation initiatives – in calibration testing of Intuitive Machines Lunar Telemetry and Tracking Network, set to support IM-1 mission NET Q1 2023 and in upcoming test of Cislunar Autonomous Positioning System on CAPSTONE

Credits: NASA, Advanced Space